Wausau Wisconsin

Engineering

August 17, 2018

2018 TABULATIONS:

Metro Ride Re-Roofing Project, Kulp's of Stratford, Stratford, $168,500 (bid results).  Bids were opened July 17, 2018.

2018 Asphalt Paving Project.  Bids were opened July 12, 2018 and are currently under review.

2018 Sidewalk Repair Project B, S.D. Ellenbecker Inc., Athens, $151,502.85 (bid results).  Bids were opened July 12, 2018.

2018 Pavement Marking Project, Century Fence Company, Pewaukee, $140,100.75 (bid results).  Bids were opened May 15, 2018.

2018 Street Sealcoating Project, Fahrner Asphalt Sealers, LLC, Plover, $424,960.31 (bid results).  Bids were opened May 8, 2018.

2018 Riverfront Playground Equipment Project, Ultimate Playgrounds, Inc., Prior Lake, MN, $949,648.53 (bid results).  Bids were opened May 1, 2018.

2018 Street Construction Project C, Switlick & Sons, Inc., Athens, $1,127,575.50 (bid results).  Bids were opened April 17, 2018.

2018 Street Construction Project B, Steen Construction, Inc., Dorchester, $813,890.10 (bid results).  Bids were opened April 3, 2018.

2018 Street Construction Project A, Steen Construction, Inc., Dorchester, $828,079.25 (bid results).  Bids were opened March 27, 2018.

2018 Sewer Rehabilitation Project, Michels Corporation, Brownsville, $383,360.75 (bid results).  Bids were opened March 27, 2018.

2018 Riverfront Redevelopment Project, Miron Construction Co., Inc., $3,236,688.36 (bid results).  Bids were opened March 22, 2018.

2018 Sidewalk Repair Project, S.D. Ellenbecker, Inc., Athens, $225,970 (bid results).  Bids were opened March 6, 2018.

2018 Concrete Pavement Repair Project, C.P.R., Inc., Brookfield, $326,960 (bid results).  Bids were opened February 6, 2018.

2017 TABULATIONS:

72nd Avenue Lift Station Replacement Project (bid results)

2017 Riverfront Pergolas (bid results)

2017 Bridge Street Bridge Pedestrian Railing (bid results)

2017 Sanitary Sewer and Watermain Project (bid results)

2017 Asphalt Paving Project (bid results)

Wausau Business Campus 2017 Expansion (bid results)

2017 Sidewalk Repair Project "B" (bid results)

2017 Riverfront Redevelopment Project.  All bids were rejected.

4th Street Sidewalk Improvement Project (bid results)

McClellan Skyway and Connecting Stair Elevator Tower.  The bid was rejected.

2017 Pavement Marking Project (bid results)

2017 Street Sealcoating Project (bid results)

2017 Street Construction Project D (bid results)

2017 Street Construction Project C (bid results)

Parking Ramps - 2017 Repairs (bid results)

Prospect Avenue Tot Lot (bid results)

2017 West Thomas Street Construction Project (bid results)

2017 Street Construction Project B (bid results)

2017 Concrete Pavement Repair Project (bid results)

2017 Alexander Park Project (bid results)

2017 Street Construction Project A (bid results)

2017 Sewer Rehabilitation Project (bid results)

Fabrication and Installation of Wayfinding Signage (bid results)

2017 Sidewalk Repair Project (bid results)

2016 TABULATIONS:

2016 Recycling of Roadway Pavement Project (bid results)

Construction Demolition Services for the former Northland Group Home and former St. James School (bid results)

2016 Pavement Marking Project (bid results)

2016 Sanitary Sewer Repair Project (bid results

2016 Asphalt Paving Project (bid results

Cleveland Avenue Lift Station Replacement Project (bid results

2016 Sidewalk Repair Project (bid results

2016 Sewer and Watermain Project D  (bid results

2016 Street Sealcoating Project (bid results

2016 Schulenburg Renovation Project (bid results

2016 Street Construction Project C (bid results

2016 Street Construction Project B (bid results

2016 Street Construction Project A (bid results

2016 Sidewalk Project (bid results

2016 Sewer Rehabilitation Project (bid results

2016 Riverfront Redevelopment Project (bid results

2016 Concrete Pavement Repair Project (bid results

2015 TABULATIONS:

Athletic Park 2016 Restroom Improvements (bid results)

2015 Asphalt Paving Project  (bid results)

2015 In-Ground Vehicle Lifts for Metro Ride  (Bid summary)

2015 1st Street Extension and Riverfront Redevelopment (bid results)

2015 Wausau Riverfront Landscaping Improvements (Bid summary)

2015 Brown Street Water Tower Painting Project - Rebid (bid results)

2015 Sealcoating Project (bid results)

2015 Street Construction Project E (bid results)

2015 Street Construction Project B (bid results)

2015 Brown Street Water Tower Painting Project.  All bids were rejected.

2015 Sidewalk Project (bid results)

2015 Street Construction Project D (bid results)

2015 Concrete Pavement Repair Project (bid results)

2015 Street Construction Project A (bid results)

2015 Sewer Rehabilitation Project (bid results)

Wastewater Treatment Facility Digester Mixing Replacement (bid results)

2014 TABULATIONS:

Excavation and Cover System Construction - 920-1000 North 1st Street - Riverfront Redevelopment Area bid results

2014 Kaiser Pool Renovation Project - Rebid bid results

2014 Pavement Marking Project bid results

2014 Stinchfield Creek Trail Project bid results

2014 Asphalt Paving Project bid results

2014 Sewer & Watermain Repair Project bid results

2014 Asphalt Patching Project bid results

2014 Street Construction Project "D" bid results

2014 Kaiser Pool Renovation Project Contract Two bid results

2014 Street Construction Project "C" bid results

2014 Street Construction Project "B" bid results

2014 Wastewater Treatment Facility Clarifier Equipment Rehabilitation or Replacement bid summary

2014 Street Sealcoating Project bid results

2014 Sewer Rehabilitation Project bid results

2014 Street Construction Project "A" bid results

2014 Sidewalk Project bid results

2014 Athletic Park Neighborhood Park Project bid results

2014 Concrete Pavement Repair Project bid results